All Work

Cloud Infrastructure Migration

Case Study
01

Timeline

14 weeks

02

Industry

Enterprise Infrastructure

03

Role

Cloud modernization consultant

04

Services

  • Cloud Assessment
  • Migration Strategy
  • Platform Engineering
  • SRE Enablement

01 โ€” Challenge

Legacy infrastructure was expensive, brittle, and slowed release velocity across multiple business-critical services.

02 โ€” Solution

We planned and executed a phased migration to resilient cloud infrastructure with IaC, observability, and release guardrails.

Key Outcomes

  • 01
    Reduced infrastructure costs by 52%.
  • 02
    Improved deployment speed by 63%.
  • 03
    Stabilized platform availability at 99.95%.

Project Gallery

Implementation Highlights

  1. 1

    Designed target architecture and migration waves.

  2. 2

    Introduced Terraform-based infrastructure provisioning.

  3. 3

    Established CI/CD and observability standards.

Tech Stack

  • AWS
  • Terraform
  • Kubernetes
  • CI/CD

Performance Metrics

  • 52% infra cost optimization
  • 63% faster deployments
  • 99.95% availability

Client Feedback

โ€œ
The migration delivered measurable reliability and cost gains without disrupting delivery.

Engineering DirectorยทEnterprise Client

Perfect

Let's talk

30 min intro call
Available for projects

Planning a similar product?

We help teams move from idea to launch with clear strategy, premium execution, and measurable outcomes.

info@adranco.com